Clifford Devlin is able to supply and deliver a full range of enabling services to establish the site prior to commencement of the demolition works. These may include some or all of the following disciplines:

  • Establishment of the site perimeter using hoardings and/or fencing, manned and lockable gates for access/egress and the installation of CCTV security systems.
  • Disconnection of services i.e. water, electricity, data, gas.
  • A traffic management plan indicating routes to be used by site vehicles, road/pavement closures, relocation of bus stops or crossings and the use of signage, banskmen and/or traffic marshalls can be prepared and submitted to the relevant authorities during the lead-in phase.
  • Any scaffolding required to access areas of the building or encase the structure can be arranged including licences.
  • Welfare and office facilities can be established in a suitable location
  • A Pre-Demolition Asbestos Survey can be carried out before works commence to identify the presence of any asbestos containing materials.
  • A photographic Schedule of Condition of the surrounding roads, footpaths and adjoining buildings can be undertaken