• Home
  • About
    • Company Profile
    • Organisation Structure
    • Management Team
    • Environment
    • Health & Safety
    • Training
    • Our Credentials
    • Management Systems
    • Finance
    • Our Policies
  • Services
    • Asbestos Management
    • Building
    • Demolition
  • Projects
    • Case Studies
  • Sectors
    • Housing
    • Education
    • Commercial
    • Infrastructure & Civil Engineering
    • Healthcare
    • Heritage
  • Clients
  • Media
    • News
    • Downloads
    • Image gallery
    • Press Clippings
  • Contact
Home / Media / Image gallery
Media
  • Media
  • News
  • Downloads
  • Image gallery
  • Press Clippings
M&E Works at Eastcheap
M&E Works at Eastcheap
Noise monitoring during demolition at the 2012 Olympic Park
Bricklaying from our Building & Special Works Division
Our Building & Special Works Division
Timber waste is segregated on-site for recycling
Non-ferrous metal wastes are collected on-site for recycling
A muncher attachment is used for structural de-construction
Structural demolition at Newbury Town Centre
Asbestos removal operatives
Asbestos removal is carried out within an air-tight enclosure
Environmental clean of asbestos debris
Our Building Division refurbishing the roof of Chelsea Cinema
Head Office of Johnson & Johnson UK
Refurbishment of Johnson & Johnson's Head Office
Our Building Division refurbished the car park at Johnson & Johnson's Head Office
Demolition of former Unwins Depot for SEEDA
Vibration sensor set-up on the Roman Wall during demolition of Tower House
Removal of Tower House which was situated above Tower Hill underground station
Refurbishment of fire-damaged Brunswick Health Centre
Refurbishment of fire-damaged Brunswick Health Centre
Asbestos training
Demolition at Brays Grove School in Harlow
Signage for access routes installed for asbestos removal
Air-tight enclosure set-up for removing licenced asbestos material
Facade retention structure erected at Barret Street in London's West End
Refurbishment to shell at Austin Friars in London EC2
High grade refurbishment and fit-out of offices in City of London
High spec refurbishment of common areas of office block in Austin Friars
Refurbishment of main entrance of Austin Friars in London EC2
Asbestos is stored at our licenced waste transfer station in Bow
Facade retention system at Barret Street, London W1
Structure in Borough High Street is fully enclosed in scaffolding and waterproof sheeting
High specification refurbishment is delivered at Blythe House
Reception area refurbished to high spec at Blythe House
Demolition works adjacent to the main railway line at London Bridge
Bricks are salvaged and reconstituted at a demolition project
Bricks being salvaged during demolition at Tottenham Court Road
Refurbishment of Centric offices in Milton Keynes
Reception area refurbished at Centric offices in Milton Keynes
Centric office entrance is re-built by Clifford Devlin's Building Division
Shell and core refurb of offices in Milton Keynes
Refurbishment of brickwork at Chelsea Cinema
Demolition at Clays Lane, 2012 Olympic Park
Demolition of Olympic Park in Stratford
Dust boss being applied to dampen demolition works in Dubai
Long reach demolition of housing for London Borough of Brent
Noise monitor used at Holland Park School
Public viewing panel at Tower House
Public going about their business adjacent to demolition site on London's South Bank
Facade retention scheme at Crown House
Facade retention of listed elevations in Aldwych
Internal view of facade retention at Aldwych
Facade retention of Crown House
Concrete and hardcore crushed on-site at Holland Park School
A concrete crusher is used on-site during demolition of Brays Grove school
Groundworks carried out at former Unwins Depot in Kent
Demolition for SEEDA in Dartford
Structural demolition of Kentish Town Sports Centre
Diamond drilling
Clifford Devlin receives a fourth consecutive Gold Medal from RoSPA
Dust Boss in action at Hendon Police College
Scaffolding erected for refurbishment of Grade II listed building in Chester
Strip-out and refurbishment of Friars House in London
Air-tight enclosure set-up for removing licenced asbestos material
Asbestos is removed under fully controlled conditions
Asbestos decontamination unit set-up at Hendon Police College
Asbestos removal from Hornsey Town Hall
Block flooring is salvaged during demolition at Hendon Police College
Courtyard at Johnson & Johnson is remodelled
Roof refurbishment at Johnson & Johnson's Head Office
The roofs at Johnson & Johnson in High Wycombe are repaired
New weatherproofing installed to roofs at Johnson & Johnson Head Office
New weatherproofing installed to roofs at Johnson & Johnson Head Office
Car park surface is planed at Johnson & Johnson
Temporary works installed to support retained structures at Kentish Town Sports Centre
Japanese Knotweed is removed from demolition site in Lewisham
Hotworks carried out during demolition of Kentish Town Sports Centre
Enclosures set-up to safely remove asbestos from Landor Rail Depot in Swansea
Landscaping at Lewisham
Facade retention system is lifted into place
Groundworks carried out to facilitate archaeological investigation by MoLAS
Asbestos is encapsulated
Temporary works support retained wall during demolition in London's West End
Facade system is installed at Tottenham Court Road
Waste timber is salvaged at a demolition project
Clifford Devlin's licenced Asbestos Waste Transfer Station in London
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
car park repair project 2017-18
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn
Cut and carve demolition project of Arab Press House in High Holborn

Contact

UK Head Office:
Clifford House,
Towcester Road
London E3 3ND

Tel : 020 7538 8721
Fax : 020 7987 1857

Click here to find us

Emails

General: info@clifford-devlin.co.uk
Asbestos: asbestos@clifford-devlin.co.uk
Building: building@clifford-devlin.co.uk
Demolition: demolition@clifford-devlin.co.uk

Follow us

  Twitter
  Linkedin
  Instagram
 
Copyright © Clifford Devlin
Terms & Conditions    |    Privacy Policy    |     Contact Us